Gallery Type
Over 100 people signed the iron beam that was then hoisted by a crane to the top of the new library building, signifying the final structural piece of steel was in place.
The Library will be closed Monday, January 19 in observance of Martin Luther King Jr. Day.
Over 100 people signed the iron beam that was then hoisted by a crane to the top of the new library building, signifying the final structural piece of steel was in place.